Loading content/_index.md +5 −5 Original line number Diff line number Diff line Loading @@ -12,17 +12,17 @@ We're expecting to begin our first deployments in Q4 2025 and Q1 2026. # Details This is an Aruba-based installation, currently slated for Aruba AP-515s. Our range is only as good as cabinets we have participating. This is an Aruba-based installation, currently being deployed on Aruba AP-635s. Our range is only as good as cabinets we have participating. The network is open, using Opportunistic Wireless Encryption (OWE). We currently have two cabinets in 1400 and 1500 committed to participation. We currently have three cabinets in 1200, 1400 and 1500 committed to participation. We have a few possible ways of back-hauling traffic back to the controller, where it is terminated and will hit the internet. - Layer 2 (requires you to provide cross-connect and be within 100 meters of us) - Layer 3 (tunneled, requires a way to terminate WireGuard and a PoE injector) - Layer 3 (v6 over FCIX or FREMIX) - Layer 3 (tunneled, requires a way to terminate WireGuard and a PoE injector) (coming soon!) - Layer 3 (v6 over FCIX or FREMIX) (coming soon!) # Contribute Loading Loading
content/_index.md +5 −5 Original line number Diff line number Diff line Loading @@ -12,17 +12,17 @@ We're expecting to begin our first deployments in Q4 2025 and Q1 2026. # Details This is an Aruba-based installation, currently slated for Aruba AP-515s. Our range is only as good as cabinets we have participating. This is an Aruba-based installation, currently being deployed on Aruba AP-635s. Our range is only as good as cabinets we have participating. The network is open, using Opportunistic Wireless Encryption (OWE). We currently have two cabinets in 1400 and 1500 committed to participation. We currently have three cabinets in 1200, 1400 and 1500 committed to participation. We have a few possible ways of back-hauling traffic back to the controller, where it is terminated and will hit the internet. - Layer 2 (requires you to provide cross-connect and be within 100 meters of us) - Layer 3 (tunneled, requires a way to terminate WireGuard and a PoE injector) - Layer 3 (v6 over FCIX or FREMIX) - Layer 3 (tunneled, requires a way to terminate WireGuard and a PoE injector) (coming soon!) - Layer 3 (v6 over FCIX or FREMIX) (coming soon!) # Contribute Loading